Regional CohortPS-0006
Prince William Digital Gateway cohort
Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.
Multiple exact scoped state assertions; no flattened badgeLocal planning candidateExecutive evidence ceiling
What a decision maker may safely take from this record
Permitted reading
An adverse or changed-status subtype is evidenced for the specified scope and date. Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.
Not established
A universal terminal state, erasure of historical states, final cancellation when only delay/appeal is shown, or failure of related phases/projects.
Owner attention
Final appellate outcome; any renewed local approvals; service, construction and operating states
- Geography
- Prince William County, Virginia
- Object subtype
- Local Planning And Litigation Cohort
- AI connection
- Data-center development; AI-specific link not yet verified
- Recorded figure
- Not normalized
- Unit basis
- No capacity counted
- Countable operating capacity
- NO
Conversion-chain position
C0–C21, without implied progression
Handling modeCOMPOSITE SCOPED
-
C0–C6
Entry and permission
- C0 Concept or rumor
- C1 Public announcement
- C2 Site identified
- C3 Land option or negotiation
- C4 Land controlled
- C5 Zoning or land-use application
- C6 Zoning or land-use approval
-
C7–C10
Service-model fork
- C7 Utility service or interconnection request
- C8 Study or review accepted
- C9 Tariff or service pathway identified
- C10 Agreement executed or obligation recorded
-
C11–C17
Build and operation
- C11 Network, generation, or facility upgrades funded
- C12 Construction started
- C13 Major electrical and cooling equipment delivered
- C14 Grid or onsite supply energized
- C15 Facility commissioned
- C16 IT capacity installed
- C17 Compute cluster operating
-
C18–C20
Dark Zone
- C18 Contracted customer use observed
- C19 Utilization or revenue effect observed
- C20 Sustained economic compute capacity
-
C21
Changed status
- C21 Delayed, cancelled, downsized, superseded, or repurposed
Recorded position: Multiple exact scoped state assertions; no flattened badge
Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.
State boundary
Scope-specific assertions
What this establishes
An adverse or changed-status subtype is evidenced for the specified scope and date.
What this does not prove
A universal terminal state, erasure of historical states, final cancellation when only delay/appeal is shown, or failure of related phases/projects.
Four-register control
Figures stay in the register that produced them
No cross-register conversion is performed without an explicit source-stated bridge.
-
R01Load Not normalized
No load-register figure is normalized in this tracker row.
No load quantity is imputed from money, supply, accelerator count or project state.
-
R02Supply No bridge inferred
No supply-register quantity is normalized for this record.
Project state is not treated as proof of deliverable, firm or operating supply.
-
R03Money No bridge inferred
No separate money-register metric is normalized for this record.
Capex, contract value, backlog, RPO, revenue and utilization are not converted into capacity or operating state.
-
R04AI-share Source-bounded description
Data-center development; AI-specific link not yet verified
Total data-center, campus or portfolio measures remain broader than AI unless the source provides an explicit AI-share boundary.
Aggregation policy: Not summable in this edition. No total, rank or realization percentage is generated.
AI-share boundary
Broader infrastructure does not become AI-only by implication
Data-center development; AI-specific link not yet verified
Atomic evidence stack
Claims retain their own ceiling, locator and sources
0 linked claims at the current cutoff.
No atomic claim is linked to this tracker row. Do not strengthen the row from surrounding context.
Record stewardship
What is known, missing and capable of changing the record
Absence of a linked item is not proof that contrary evidence does not exist.
Continue to treat unknown information as unknown, not zero.
A qualifying evidence delta requires review and rebuild.
What could change this record
OIR-0033· Final appellate disposition or replacement approval changes Digital Gateway legal state.Required update: Inspect controlling court/local record and update legal and physical states separately.
Source register
Trace the public record
3 linked sources; rights and locators remain attached.
Source records
-
Prince William County, Virginia · 2025-01-01 · Tier A
Locator: Planning record and linked approvals
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE
-
SRC-0120— Digital Gateway rezoning appeals opinionCourt of Appeals of Virginia · 2026-03-31 · Tier A
Locator: Opinion pp. 4–5 and 52–53; records identified in Pass 05
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE
-
SRC-0121— Virginia appeals list associated with Digital Gateway recordsVirginia appellate courts · 2026-06-02 · Tier A
Locator: Appeals list p. 1
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE