Regional CohortPS-0006

Prince William Digital Gateway cohort

Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.

Multiple exact scoped state assertions; no flattened badgeLocal planning candidate

Executive evidence ceiling

What a decision maker may safely take from this record

Permitted reading

An adverse or changed-status subtype is evidenced for the specified scope and date. Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.

Not established

A universal terminal state, erasure of historical states, final cancellation when only delay/appeal is shown, or failure of related phases/projects.

Owner attention

Final appellate outcome; any renewed local approvals; service, construction and operating states

Geography
Prince William County, Virginia
Object subtype
Local Planning And Litigation Cohort
AI connection
Data-center development; AI-specific link not yet verified
Recorded figure
Not normalized
Unit basis
No capacity counted
Countable operating capacity
NO

Conversion-chain position

C0–C21, without implied progression

Handling modeCOMPOSITE SCOPED

Explicitly represented in this record Not established by this record
  1. C0–C6

    Entry and permission

    1. C0 Concept or rumor
    2. C1 Public announcement
    3. C2 Site identified
    4. C3 Land option or negotiation
    5. C4 Land controlled
    6. C5 Zoning or land-use application
    7. C6 Zoning or land-use approval
  2. C7–C10

    Service-model fork

    1. C7 Utility service or interconnection request
    2. C8 Study or review accepted
    3. C9 Tariff or service pathway identified
    4. C10 Agreement executed or obligation recorded
  3. C11–C17

    Build and operation

    1. C11 Network, generation, or facility upgrades funded
    2. C12 Construction started
    3. C13 Major electrical and cooling equipment delivered
    4. C14 Grid or onsite supply energized
    5. C15 Facility commissioned
    6. C16 IT capacity installed
    7. C17 Compute cluster operating
  4. C18–C20

    Dark Zone

    1. C18 Contracted customer use observed
    2. C19 Utilization or revenue effect observed
    3. C20 Sustained economic compute capacity
  5. C21

    Changed status

    1. C21 Delayed, cancelled, downsized, superseded, or repurposed

Recorded position: Multiple exact scoped state assertions; no flattened badge

Intermediate appellate opinion held three rezonings void ab initio; further appeals pending; this is not a final cancellation or physical-state finding.

State boundary

Scope-specific assertions

C21Delayed, cancelled, downsized, superseded, or repurposedLocal planning candidate

What this establishes

An adverse or changed-status subtype is evidenced for the specified scope and date.

What this does not prove

A universal terminal state, erasure of historical states, final cancellation when only delay/appeal is shown, or failure of related phases/projects.

Four-register control

Figures stay in the register that produced them

No cross-register conversion is performed without an explicit source-stated bridge.

  1. R01Load

    Not normalized

    No load-register figure is normalized in this tracker row.

    No load quantity is imputed from money, supply, accelerator count or project state.

  2. R02Supply

    No bridge inferred

    No supply-register quantity is normalized for this record.

    Project state is not treated as proof of deliverable, firm or operating supply.

  3. R03Money

    No bridge inferred

    No separate money-register metric is normalized for this record.

    Capex, contract value, backlog, RPO, revenue and utilization are not converted into capacity or operating state.

  4. R04AI-share

    Source-bounded description

    Data-center development; AI-specific link not yet verified

    Total data-center, campus or portfolio measures remain broader than AI unless the source provides an explicit AI-share boundary.

Aggregation policy: Not summable in this edition. No total, rank or realization percentage is generated.

AI-share boundary

Broader infrastructure does not become AI-only by implication

Data-center development; AI-specific link not yet verified

01

Broader measured scope

Campus, data-center, portfolio, utility, accelerator or financial quantity.

Explicit source bridge

Named AI workload or customer scope · denominator · period · allocation method.

02

AI-attributable subset

Reportable only to the extent directly defined by the source.

Source-bounded AI description

Without the bridge, retain the broader label and stop the attribution.

Control rule: GPU count, company narrative, total campus MW or portfolio capex does not supply an AI-share denominator on its own.

Atomic evidence stack

Claims retain their own ceiling, locator and sources

0 linked claims at the current cutoff.

No atomic claim is linked to this tracker row. Do not strengthen the row from surrounding context.

Record stewardship

What is known, missing and capable of changing the record

Contrary evidenceNo linked test at cutoff

Absence of a linked item is not proof that contrary evidence does not exist.

Negative findingsNo linked negative finding

Continue to treat unknown information as unknown, not zero.

Reopen triggers1 active rule

A qualifying evidence delta requires review and rebuild.

What could change this record

  • OIR-0033 · Final appellate disposition or replacement approval changes Digital Gateway legal state.

    Required update: Inspect controlling court/local record and update legal and physical states separately.

Source register

Trace the public record

3 linked sources; rights and locators remain attached.

Source records

  1. SRC-0055 — PW Digital Gateway

    Prince William County, Virginia · 2025-01-01 · Tier A

    Locator: Planning record and linked approvals

    PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE

  2. SRC-0120 — Digital Gateway rezoning appeals opinion

    Court of Appeals of Virginia · 2026-03-31 · Tier A

    Locator: Opinion pp. 4–5 and 52–53; records identified in Pass 05

    PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE

  3. SRC-0121 — Virginia appeals list associated with Digital Gateway records

    Virginia appellate courts · 2026-06-02 · Tier A

    Locator: Appeals list p. 1

    PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE