Management and editorial clarity
Release and stewardship center
A public operating view of the current edition: what is released, which role stewards each record, which evidence triggers receive priority and how a verified change becomes a rebuilt page.
Edition control
What this release represents
Source contract
37 / 37 controlled profile routes
No fallback to a three-profile implementation is permitted.
Build contract
Static Astro output · Cloudflare Workers Static Assets · 0 client-side JavaScript
Canonical metadata and indexing policy are environment-controlled at build time.
Monitoring boundary
Event-led review only; no continuous or real-time monitoring claim.
A trigger creates a review obligation only after qualifying evidence is located and reconciled.
Public-operations boundary
This center exposes roles, dates, priorities and procedures.
It does not expose credentials, private notes, unpublished drafts, inboxes or deployment secrets.
Controlled build history
How the publication reached the current edition
Build changes are separate from evidence updates.
- 2.0.0
Enterprise production release
Final production packaging, acceptance matrix, operator deployment and rollback runbooks, live smoke tooling and reproducible release manifests.
- 1.9.0
Enterprise quality assurance
All-route responsive QA, accessibility corrections, print/PDF validation and explicit cross-engine acceptance gates.
- 1.8.0
Brand and distribution surfaces
Page-specific social cards, citation surfaces, print covers and complete application-icon metadata.
- 1.7.0
Management and editorial clarity
Release center, role-based stewardship, review queue, aging controls and a public update workflow.
- 1.6.0
Signature evidence visualizations
Service-model fork, Dark Zone, AI-share boundary and shared evidence-signal language.
- 1.5.0
Cases and explainers
Eight intelligence reports and four long-form methodological explainers.
- 1.4.0
Unified profile workspace
One controlled enterprise profile architecture across all 37 tracker records.
- 1.3.0
Tracker as a data product
Seven object-class views, compact records and explicit registry controls.
- 1.2.0
Production and public brand
Canonical production origin, public naming, structured metadata and Workers Static Assets release path.
Evidence corrections and state changes belong in the evidence update archive; this list records product and release architecture.
Role-based ownership
Stewardship desks
Roles describe public maintenance responsibility, not private personnel assignments.
23 records
Project & campus evidence desk
Named projects, campus phases, contractual power arrangements and project-level delivery milestones.
- P1
- 6
- P2
- 17
8 records
Market systems desk
Regional cohorts, queue populations, planning datasets and vintage-controlled aggregates.
- P1
- 2
- P2
- 6
3 records
Regulatory evidence desk
Dockets, tariffs, orders, legal posture and framework-level state controls.
- P1
- 2
- P2
- 1
1 records
Corporate filings desk
Issuer disclosures, periodic filings, contractual disclosures and financial scope.
- P1
- 0
- P2
- 1
1 records
Forecast & methods desk
Forecast vintages, methods, scenario boundaries and non-project quantitative objects.
- P1
- 1
- P2
- 0
1 records
Technical systems desk
Technical dependencies, standards, market rules and system-level operating constraints.
- P1
- 0
- P2
- 1
Event-led review queue
37 records ordered by reopen priority
Priority reflects trigger severity, not project quality, probability or investment risk.
PS-0002Regional Cohort
ERCOT large-load request cohort
Texas / ERCOTStewardship
Market systems deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Project IDs, duplication, attrition, approval states
OIR-0005 · CRITICAL
ERCOT releases a newer large-load request, screening, forecast, withdrawal, or interconnection-status dataset.
- Status
- OPEN
- Next check
- Each ERCOT update
- Minimum update
- Preserve prior snapshot; add new vintage, state definitions, attrition/duplication changes, and affected aggregates.
PS-0003Forecast Object
PJM AEP-zone large-load forecast cohort
Ohio/PJM AEP zoneStewardship
Forecast & methods deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Project-level mapping and realization
OIR-0008 · CRITICAL
New official demand forecast, project pipeline, operational-data accuracy report, or material project cancellation/energization is published.
- Status
- OPEN
- Next check
- Every forecast release and material project event
- Minimum update
- Add vintage rather than overwrite; reconcile project IDs; update state and double-counting register.
PS-0004Regional Cohort
Northern Virginia/NOVEC data-center cohort
Northern VirginiaStewardship
Market systems deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Project identity, meter basis, utilization, later updates
OIR-0008 · CRITICAL
New official demand forecast, project pipeline, operational-data accuracy report, or material project cancellation/energization is published.
- Status
- OPEN
- Next check
- Every forecast release and material project event
- Minimum update
- Add vintage rather than overwrite; reconcile project IDs; update state and double-counting register.
PS-0007Regulatory Or Tariff Framework
Georgia >100 MW large-load contract cohort
GeorgiaStewardship
Regulatory evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Redacted customer identities and terms
OIR-0007 · CRITICAL
Ohio appeal resolves, or Ohio/Georgia/Virginia tariffs/contracts are modified, stayed, superseded, or implemented through new sheets/orders.
- Status
- OPEN
- Next check
- Pass 04 and court/commission actions
- Minimum update
- Retrieve final holdings/effective sheets; record customer obligations, conditions, supersession, and legal finality.
PS-0008Regulatory Or Tariff Framework
AEP Ohio data-center customer cohort
OhioStewardship
Regulatory evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Customer identities, project states, full effective terms
OIR-0007 · CRITICAL
Ohio appeal resolves, or Ohio/Georgia/Virginia tariffs/contracts are modified, stayed, superseded, or implemented through new sheets/orders.
- Status
- OPEN
- Next check
- Pass 04 and court/commission actions
- Minimum update
- Retrieve final holdings/effective sheets; record customer obligations, conditions, supersession, and legal finality.
PS-0012Project Campus Or Phase
Stargate I / Crusoe Abilene initial phase
Abilene area, Taylor County, TexasStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Measured load, installed IT quantity, utilization, customer use, revenue/economic output
OIR-0020 · CRITICAL
Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.
- Status
- OPEN
- Next check
- Pass 07 and every current-status refresh
- Minimum update
- Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
PS-0013Project Campus Or Phase
Crusoe Abilene full-campus expansion
Abilene area, Taylor County, TexasStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL2 linked OIRsAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Phase-level permits, delivery, energization and commissioning quantities
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
OIR-0020 · CRITICAL
Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.
- Status
- OPEN
- Next check
- Pass 07 and every current-status refresh
- Minimum update
- Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
PS-0024Project
Meta Kansas City data center
Kansas City, MissouriStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Operating load, IT capacity, AI share, utilization, customer use and economics
OIR-0020 · CRITICAL
Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.
- Status
- OPEN
- Next check
- Pass 07 and every current-status refresh
- Minimum update
- Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
PS-0025Project
xAI Colossus
Memphis, TennesseeStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Dated configuration, measured load, supporting infrastructure, utilization and economic output
OIR-0020 · CRITICAL
Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.
- Status
- OPEN
- Next check
- Pass 07 and every current-status refresh
- Minimum update
- Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
PS-0028Project Campus Or Phase
Google Jackson County existing data center campus
Jackson County, AlabamaStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Operating MW, IT capacity, AI share, utilization and economic output
OIR-0020 · CRITICAL
Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.
- Status
- OPEN
- Next check
- Pass 07 and every current-status refresh
- Minimum update
- Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
PS-0036Project
Vantage Lighthouse campus
Port Washington, WisconsinStewardship
Project & campus evidence deskCritical evidence watchReview control
P1CRITICAL1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Electrical delivery, occupancy, commissioning, IT installation, customer use and utilization
OIR-0038 · CRITICAL
Vantage Lighthouse receives occupancy/commissioning evidence or material permit/service change.
- Status
- OPEN
- Next check
- On official milestone
- Minimum update
- Update permission, energization, commissioning and operating states separately.
PS-0001Project Campus Or Phase
Susquehanna / AWS Data Campus contractual power arrangement
Pennsylvania / PJMStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Detailed delivery profile, campus energization, utilization and economics not public
OIR-0051 · HIGH
Talen or AWS discloses delivery commencement, revised PPA quantity, regulatory change, campus energization or termination affecting the 1,920 MW arrangement.
- Status
- OPEN
- Next check
- On official filing/order/project disclosure
- Minimum update
- Separate contract amendment, generation delivery, grid service, campus energization and operating load.
PS-0005Regional Cohort
Loudoun County data-center development cohort
Loudoun County, VirginiaStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Project-level crosswalk to utility/operation
OIR-0011 · HIGH
Selected localities issue new zoning, permit, water, incentive, appeal, or litigation records.
- Status
- OPEN
- Next check
- Relevant local docket actions
- Minimum update
- Update application/permit/agreement state, conditions, appeal, capacity basis, and project crosswalk.
PS-0006Regional Cohort
Prince William Digital Gateway cohort
Prince William County, VirginiaStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Final appellate outcome; any renewed local approvals; service, construction and operating states
OIR-0033 · HIGH
Final appellate disposition or replacement approval changes Digital Gateway legal state.
- Status
- OPEN
- Next check
- On official appellate or replacement-approval action
- Minimum update
- Inspect controlling court/local record and update legal and physical states separately.
PS-0009Regulatory Or Tariff Framework
SPP HILL participant cohort
SPP footprintStewardship
Regulatory evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Participant identities and results
OIR-0053 · HIGH
SPP files CHILLS compliance, FERC acts on compliance, or a public participant agreement/service outcome appears.
- Status
- OPEN
- Next check
- On official ER26-1323 compliance or participant record
- Minimum update
- Separate tariff compliance, agreement execution, service commencement, curtailment and operating outcomes.
PS-0010Regional Cohort
Hillsboro data-center cohort
Hillsboro, OregonStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Permits, agreements, operations by site
OIR-0011 · HIGH
Selected localities issue new zoning, permit, water, incentive, appeal, or litigation records.
- Status
- OPEN
- Next check
- Relevant local docket actions
- Minimum update
- Update application/permit/agreement state, conditions, appeal, capacity basis, and project crosswalk.
PS-0011Technical Or Market Dependency
Arizona computational-load flexibility demonstration candidate
ArizonaStewardship
Technical systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
55 daysReview due · verified Jun 17, 2026Review basis and next check
Public-record gap: Primary report, protocol, measured performance, customer obligations
OIR-0009 · HIGH
A public field demonstration or binding service agreement provides measured AI/computational-load flexibility evidence.
- Status
- OPEN
- Next check
- When primary report is located
- Minimum update
- Capture workload, baseline, response speed/duration, customer constraints, sample, and transferability limits.
PS-0014Project
Stargate Shackelford County site
Shackelford County, TexasStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Land control, permits, service/interconnection, construction and site capacity
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0015Project
Stargate Doña Ana County site
Doña Ana County, New MexicoStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Land control, permits, service/interconnection, construction and site capacity
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0016Project
Stargate Wisconsin site
Wisconsin, locality not normalized in Pass 02Stewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Locality, land, permits, utility path, construction and capacity allocation
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0017Project
Stargate Lordstown site
Lordstown, OhioStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Permits, service path, progress, energized and commissioned quantity
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0018Project
Stargate Milam County site
Milam County, TexasStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Land/control instrument, permits, energy deliverability, construction and capacity allocation
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0019Project Campus Or Phase
Microsoft Mount Pleasant data center campus
Mount Pleasant, Racine County, WisconsinStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Energization, commissioning, IT installation, site load and workload
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0020Project
Meta Richland Parish data center / Hyperion
Richland Parish, LouisianaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Permits, electrical basis, phase allocation, energization and commissioning
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0021Project
Meta Lebanon data center
Lebanon, IndianaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site-specific power basis, construction milestones, energization and commissioning
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0022Project
Meta El Paso data center
El Paso, TexasStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site-specific power basis, construction milestones, energization and commissioning
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0023Project
Meta Tulsa data center
Tulsa, OklahomaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site-specific power basis, construction milestones, energization and commissioning
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0026Project
Google Mesa data center
Mesa, ArizonaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Cause, revised completion date, construction/energization milestones and site load
OIR-0021 · HIGH
Google updates Mesa to operating, cancels/downsides it, supplies a revised date, or a public primary record establishes the cause of delay.
- Status
- OPEN
- Next check
- Each current-status refresh
- Minimum update
- Add new dated state; distinguish objective, current implementation and cause; do not infer causation from chronology.
PS-0027Project
Google Meitner energy center and data center
Gray and Roberts Counties, TexasStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Land control, permits, generation/interconnection, contracts, construction and delivery
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0029Project Campus Or Phase
Google Jackson County 2026–2027 expansion
Jackson County, AlabamaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Scope, permits, construction, energization, IT and capacity
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0030Project
AWS Northern Indiana campus
Northern IndianaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site boundary, long-term energy agreement, permits, construction and power
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0031Project
AWS Richmond County North Carolina campus
Richmond County, North CarolinaStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site power, contracts, permits, construction progress and energization
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0032Regional Cohort
AWS Pennsylvania initial site cohort
Salem Township and Falls Township, PennsylvaniaStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Individual site control, approvals, service, construction and allocation
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0033Project
AWS Warren County Mississippi campus
Warren County, MississippiStewardship
Project & campus evidence deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site, land, permits, construction, power and capacity
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0034Regional Cohort
AWS Madison County Mississippi original campus cohort
Madison County, MississippiStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Individual site states, phase progress, power, energization and spend reconciliation
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0035Regional Cohort
AWS Mississippi 2026 expansion cohort
Madison County and Clinton, MississippiStewardship
Market systems deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Project boundaries, phase state, contracts, construction and power
OIR-0019 · HIGH
Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.
- Status
- OPEN
- Next check
- Each subsequent pass
- Minimum update
- Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.
PS-0037Company Disclosure Object
CoreWeave active and contracted power portfolio
United States and international portfolio; site allocation not fully disclosedStewardship
Corporate filings deskHigh-priority evidence watchReview control
P2HIGH1 linked OIRAge at edition
54 daysReview due · verified Jun 18, 2026Review basis and next check
Public-record gap: Site allocation, metering boundary, average load, utilization and C20 economics
OIR-0049 · HIGH
Comparable public utilization, average-load or C20 evidence becomes available for CoreWeave, Equinix xScale or a named operating AI cluster.
- Status
- OPEN
- Next check
- Only on official comparable disclosure
- Minimum update
- Normalize meter boundary, time period, denominator, AI share and economic measure before state upgrade.
Controlled update procedure
From evidence delta to rebuilt profile
Editorial narrative changes only after atomic evidence controls are updated.
- 1
Intake the evidence delta
Capture the source, exact locator, publication date, object scope and the proposition that may have changed.
- 2
Resolve the object boundary
Confirm whether the evidence concerns a project, phase, cohort, forecast, framework, disclosure or dependency.
- 3
Update atomic evidence
Amend or add source, claim, contrary-evidence, negative-finding and open-issue records before editing narrative copy.
- 4
Re-run state and unit controls
Apply the relevant C-state rule, preserve instrument and vintage, and do not convert or aggregate without an explicit bridge.
- 5
Test the stronger reading
Document rival propositions, public-record gaps and any reason the new evidence still fails to establish a later state.
- 6
Update the controlled profile
Revise the evidence ceiling, registers, state assertions and reopen conditions; retain superseded evidence in the archive.
- 7
Verify and release
Run source, data, Astro, HTML, route, sitemap, metadata and Workers checks before creating a new edition entry.
Maintainer checklist
Seven gates before publication
Scope
Object type, geography and record boundary are explicit.
State
C-state or non-project handling is supported and does not transfer across pathways.
Units
Raw value, unit basis, instrument, vintage and non-summability are preserved.
Evidence
Claims retain source IDs, exact locators, confidence and ceilings.
Challenge
Contrary evidence and negative findings were checked before strengthening.
Maintenance
Reopen condition, next-check basis and stewardship desk are present.
Release
Routes, metadata, sitemap, indexing policy and static-build constraints pass.