Management and editorial clarity

Release and stewardship center

A public operating view of the current edition: what is released, which role stewards each record, which evidence triggers receive priority and how a verified change becomes a rebuilt page.

37controlled recordsAll have profile routes.
38linked reopen controlsEvent-led, not continuously polled.
11P1 evidence watchesCritical trigger severity.
26P2 evidence watchesHigh or medium-high severity.
0current at editionVerified within seven days of release.
6stewardship desksPublic role classes, not user accounts.

Edition control

What this release represents

Source contract

37 / 37 controlled profile routes

No fallback to a three-profile implementation is permitted.

Build contract

Static Astro output · Cloudflare Workers Static Assets · 0 client-side JavaScript

Canonical metadata and indexing policy are environment-controlled at build time.

Monitoring boundary

Event-led review only; no continuous or real-time monitoring claim.

A trigger creates a review obligation only after qualifying evidence is located and reconciled.

Public-operations boundary

This center exposes roles, dates, priorities and procedures.

It does not expose credentials, private notes, unpublished drafts, inboxes or deployment secrets.

Controlled build history

How the publication reached the current edition

Build changes are separate from evidence updates.

  1. 2.0.0

    Enterprise production release

    Final production packaging, acceptance matrix, operator deployment and rollback runbooks, live smoke tooling and reproducible release manifests.

  2. 1.9.0

    Enterprise quality assurance

    All-route responsive QA, accessibility corrections, print/PDF validation and explicit cross-engine acceptance gates.

  3. 1.8.0

    Brand and distribution surfaces

    Page-specific social cards, citation surfaces, print covers and complete application-icon metadata.

  4. 1.7.0

    Management and editorial clarity

    Release center, role-based stewardship, review queue, aging controls and a public update workflow.

  5. 1.6.0

    Signature evidence visualizations

    Service-model fork, Dark Zone, AI-share boundary and shared evidence-signal language.

  6. 1.5.0

    Cases and explainers

    Eight intelligence reports and four long-form methodological explainers.

  7. 1.4.0

    Unified profile workspace

    One controlled enterprise profile architecture across all 37 tracker records.

  8. 1.3.0

    Tracker as a data product

    Seven object-class views, compact records and explicit registry controls.

  9. 1.2.0

    Production and public brand

    Canonical production origin, public naming, structured metadata and Workers Static Assets release path.

Evidence corrections and state changes belong in the evidence update archive; this list records product and release architecture.

Role-based ownership

Stewardship desks

Roles describe public maintenance responsibility, not private personnel assignments.

23 records

Project & campus evidence desk

Named projects, campus phases, contractual power arrangements and project-level delivery milestones.

P1
6
P2
17

8 records

Market systems desk

Regional cohorts, queue populations, planning datasets and vintage-controlled aggregates.

P1
2
P2
6

3 records

Regulatory evidence desk

Dockets, tariffs, orders, legal posture and framework-level state controls.

P1
2
P2
1

1 records

Corporate filings desk

Issuer disclosures, periodic filings, contractual disclosures and financial scope.

P1
0
P2
1

1 records

Forecast & methods desk

Forecast vintages, methods, scenario boundaries and non-project quantitative objects.

P1
1
P2
0

1 records

Technical systems desk

Technical dependencies, standards, market rules and system-level operating constraints.

P1
0
P2
1

Event-led review queue

37 records ordered by reopen priority

Priority reflects trigger severity, not project quality, probability or investment risk.

P1 critical evidence watch P2 high-priority evidence watch P3 scheduled evidence watch P4 controlled watch

PS-0002Regional Cohort

ERCOT large-load request cohort

Texas / ERCOT

Stewardship

Market systems deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Project IDs, duplication, attrition, approval states

OIR-0005 · CRITICAL

ERCOT releases a newer large-load request, screening, forecast, withdrawal, or interconnection-status dataset.

Status
OPEN
Next check
Each ERCOT update
Minimum update
Preserve prior snapshot; add new vintage, state definitions, attrition/duplication changes, and affected aggregates.

PS-0003Forecast Object

PJM AEP-zone large-load forecast cohort

Ohio/PJM AEP zone

Stewardship

Forecast & methods deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Project-level mapping and realization

OIR-0008 · CRITICAL

New official demand forecast, project pipeline, operational-data accuracy report, or material project cancellation/energization is published.

Status
OPEN
Next check
Every forecast release and material project event
Minimum update
Add vintage rather than overwrite; reconcile project IDs; update state and double-counting register.

PS-0004Regional Cohort

Northern Virginia/NOVEC data-center cohort

Northern Virginia

Stewardship

Market systems deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Project identity, meter basis, utilization, later updates

OIR-0008 · CRITICAL

New official demand forecast, project pipeline, operational-data accuracy report, or material project cancellation/energization is published.

Status
OPEN
Next check
Every forecast release and material project event
Minimum update
Add vintage rather than overwrite; reconcile project IDs; update state and double-counting register.

PS-0007Regulatory Or Tariff Framework

Georgia >100 MW large-load contract cohort

Georgia

Stewardship

Regulatory evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Redacted customer identities and terms

OIR-0007 · CRITICAL

Ohio appeal resolves, or Ohio/Georgia/Virginia tariffs/contracts are modified, stayed, superseded, or implemented through new sheets/orders.

Status
OPEN
Next check
Pass 04 and court/commission actions
Minimum update
Retrieve final holdings/effective sheets; record customer obligations, conditions, supersession, and legal finality.

PS-0008Regulatory Or Tariff Framework

AEP Ohio data-center customer cohort

Ohio

Stewardship

Regulatory evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Customer identities, project states, full effective terms

OIR-0007 · CRITICAL

Ohio appeal resolves, or Ohio/Georgia/Virginia tariffs/contracts are modified, stayed, superseded, or implemented through new sheets/orders.

Status
OPEN
Next check
Pass 04 and court/commission actions
Minimum update
Retrieve final holdings/effective sheets; record customer obligations, conditions, supersession, and legal finality.

PS-0012Project Campus Or Phase

Stargate I / Crusoe Abilene initial phase

Abilene area, Taylor County, Texas

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Measured load, installed IT quantity, utilization, customer use, revenue/economic output

OIR-0020 · CRITICAL

Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.

Status
OPEN
Next check
Pass 07 and every current-status refresh
Minimum update
Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.

PS-0013Project Campus Or Phase

Crusoe Abilene full-campus expansion

Abilene area, Taylor County, Texas

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL2 linked OIRs

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Phase-level permits, delivery, energization and commissioning quantities

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

OIR-0020 · CRITICAL

Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.

Status
OPEN
Next check
Pass 07 and every current-status refresh
Minimum update
Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.

PS-0024Project

Meta Kansas City data center

Kansas City, Missouri

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Operating load, IT capacity, AI share, utilization, customer use and economics

OIR-0020 · CRITICAL

Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.

Status
OPEN
Next check
Pass 07 and every current-status refresh
Minimum update
Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.

PS-0025Project

xAI Colossus

Memphis, Tennessee

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Dated configuration, measured load, supporting infrastructure, utilization and economic output

OIR-0020 · CRITICAL

Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.

Status
OPEN
Next check
Pass 07 and every current-status refresh
Minimum update
Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.

PS-0028Project Campus Or Phase

Google Jackson County existing data center campus

Jackson County, Alabama

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Operating MW, IT capacity, AI share, utilization and economic output

OIR-0020 · CRITICAL

Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.

Status
OPEN
Next check
Pass 07 and every current-status refresh
Minimum update
Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.

PS-0036Project

Vantage Lighthouse campus

Port Washington, Wisconsin

Stewardship

Project & campus evidence deskCritical evidence watch

Review control

P1CRITICAL1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Electrical delivery, occupancy, commissioning, IT installation, customer use and utilization

OIR-0038 · CRITICAL

Vantage Lighthouse receives occupancy/commissioning evidence or material permit/service change.

Status
OPEN
Next check
On official milestone
Minimum update
Update permission, energization, commissioning and operating states separately.

PS-0001Project Campus Or Phase

Susquehanna / AWS Data Campus contractual power arrangement

Pennsylvania / PJM

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Detailed delivery profile, campus energization, utilization and economics not public

OIR-0051 · HIGH

Talen or AWS discloses delivery commencement, revised PPA quantity, regulatory change, campus energization or termination affecting the 1,920 MW arrangement.

Status
OPEN
Next check
On official filing/order/project disclosure
Minimum update
Separate contract amendment, generation delivery, grid service, campus energization and operating load.

PS-0005Regional Cohort

Loudoun County data-center development cohort

Loudoun County, Virginia

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Project-level crosswalk to utility/operation

OIR-0011 · HIGH

Selected localities issue new zoning, permit, water, incentive, appeal, or litigation records.

Status
OPEN
Next check
Relevant local docket actions
Minimum update
Update application/permit/agreement state, conditions, appeal, capacity basis, and project crosswalk.

PS-0006Regional Cohort

Prince William Digital Gateway cohort

Prince William County, Virginia

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Final appellate outcome; any renewed local approvals; service, construction and operating states

OIR-0033 · HIGH

Final appellate disposition or replacement approval changes Digital Gateway legal state.

Status
OPEN
Next check
On official appellate or replacement-approval action
Minimum update
Inspect controlling court/local record and update legal and physical states separately.

PS-0009Regulatory Or Tariff Framework

SPP HILL participant cohort

SPP footprint

Stewardship

Regulatory evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Participant identities and results

OIR-0053 · HIGH

SPP files CHILLS compliance, FERC acts on compliance, or a public participant agreement/service outcome appears.

Status
OPEN
Next check
On official ER26-1323 compliance or participant record
Minimum update
Separate tariff compliance, agreement execution, service commencement, curtailment and operating outcomes.

PS-0010Regional Cohort

Hillsboro data-center cohort

Hillsboro, Oregon

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Permits, agreements, operations by site

OIR-0011 · HIGH

Selected localities issue new zoning, permit, water, incentive, appeal, or litigation records.

Status
OPEN
Next check
Relevant local docket actions
Minimum update
Update application/permit/agreement state, conditions, appeal, capacity basis, and project crosswalk.

PS-0011Technical Or Market Dependency

Arizona computational-load flexibility demonstration candidate

Arizona

Stewardship

Technical systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

55 daysReview due · verified Jun 17, 2026
Review basis and next check

Public-record gap: Primary report, protocol, measured performance, customer obligations

OIR-0009 · HIGH

A public field demonstration or binding service agreement provides measured AI/computational-load flexibility evidence.

Status
OPEN
Next check
When primary report is located
Minimum update
Capture workload, baseline, response speed/duration, customer constraints, sample, and transferability limits.

PS-0014Project

Stargate Shackelford County site

Shackelford County, Texas

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Land control, permits, service/interconnection, construction and site capacity

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0015Project

Stargate Doña Ana County site

Doña Ana County, New Mexico

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Land control, permits, service/interconnection, construction and site capacity

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0016Project

Stargate Wisconsin site

Wisconsin, locality not normalized in Pass 02

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Locality, land, permits, utility path, construction and capacity allocation

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0017Project

Stargate Lordstown site

Lordstown, Ohio

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Permits, service path, progress, energized and commissioned quantity

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0018Project

Stargate Milam County site

Milam County, Texas

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Land/control instrument, permits, energy deliverability, construction and capacity allocation

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0019Project Campus Or Phase

Microsoft Mount Pleasant data center campus

Mount Pleasant, Racine County, Wisconsin

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Energization, commissioning, IT installation, site load and workload

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0020Project

Meta Richland Parish data center / Hyperion

Richland Parish, Louisiana

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Permits, electrical basis, phase allocation, energization and commissioning

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0021Project

Meta Lebanon data center

Lebanon, Indiana

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site-specific power basis, construction milestones, energization and commissioning

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0022Project

Meta El Paso data center

El Paso, Texas

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site-specific power basis, construction milestones, energization and commissioning

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0023Project

Meta Tulsa data center

Tulsa, Oklahoma

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site-specific power basis, construction milestones, energization and commissioning

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0026Project

Google Mesa data center

Mesa, Arizona

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Cause, revised completion date, construction/energization milestones and site load

OIR-0021 · HIGH

Google updates Mesa to operating, cancels/downsides it, supplies a revised date, or a public primary record establishes the cause of delay.

Status
OPEN
Next check
Each current-status refresh
Minimum update
Add new dated state; distinguish objective, current implementation and cause; do not infer causation from chronology.

PS-0027Project

Google Meitner energy center and data center

Gray and Roberts Counties, Texas

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Land control, permits, generation/interconnection, contracts, construction and delivery

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0029Project Campus Or Phase

Google Jackson County 2026–2027 expansion

Jackson County, Alabama

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Scope, permits, construction, energization, IT and capacity

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0030Project

AWS Northern Indiana campus

Northern Indiana

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site boundary, long-term energy agreement, permits, construction and power

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0031Project

AWS Richmond County North Carolina campus

Richmond County, North Carolina

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site power, contracts, permits, construction progress and energization

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0032Regional Cohort

AWS Pennsylvania initial site cohort

Salem Township and Falls Township, Pennsylvania

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Individual site control, approvals, service, construction and allocation

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0033Project

AWS Warren County Mississippi campus

Warren County, Mississippi

Stewardship

Project & campus evidence deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site, land, permits, construction, power and capacity

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0034Regional Cohort

AWS Madison County Mississippi original campus cohort

Madison County, Mississippi

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Individual site states, phase progress, power, energization and spend reconciliation

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0035Regional Cohort

AWS Mississippi 2026 expansion cohort

Madison County and Clinton, Mississippi

Stewardship

Market systems deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Project boundaries, phase state, contracts, construction and power

OIR-0019 · HIGH

Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

Status
OPEN
Next check
Each subsequent pass
Minimum update
Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

PS-0037Company Disclosure Object

CoreWeave active and contracted power portfolio

United States and international portfolio; site allocation not fully disclosed

Stewardship

Corporate filings deskHigh-priority evidence watch

Review control

P2HIGH1 linked OIR

Age at edition

54 daysReview due · verified Jun 18, 2026
Review basis and next check

Public-record gap: Site allocation, metering boundary, average load, utilization and C20 economics

OIR-0049 · HIGH

Comparable public utilization, average-load or C20 evidence becomes available for CoreWeave, Equinix xScale or a named operating AI cluster.

Status
OPEN
Next check
Only on official comparable disclosure
Minimum update
Normalize meter boundary, time period, denominator, AI share and economic measure before state upgrade.

Controlled update procedure

From evidence delta to rebuilt profile

Editorial narrative changes only after atomic evidence controls are updated.

  1. 1

    Intake the evidence delta

    Capture the source, exact locator, publication date, object scope and the proposition that may have changed.

  2. 2

    Resolve the object boundary

    Confirm whether the evidence concerns a project, phase, cohort, forecast, framework, disclosure or dependency.

  3. 3

    Update atomic evidence

    Amend or add source, claim, contrary-evidence, negative-finding and open-issue records before editing narrative copy.

  4. 4

    Re-run state and unit controls

    Apply the relevant C-state rule, preserve instrument and vintage, and do not convert or aggregate without an explicit bridge.

  5. 5

    Test the stronger reading

    Document rival propositions, public-record gaps and any reason the new evidence still fails to establish a later state.

  6. 6

    Update the controlled profile

    Revise the evidence ceiling, registers, state assertions and reopen conditions; retain superseded evidence in the archive.

  7. 7

    Verify and release

    Run source, data, Astro, HTML, route, sitemap, metadata and Workers checks before creating a new edition entry.

Maintainer checklist

Seven gates before publication

Scope

Object type, geography and record boundary are explicit.

State

C-state or non-project handling is supported and does not transfer across pathways.

Units

Raw value, unit basis, instrument, vintage and non-summability are preserved.

Evidence

Claims retain source IDs, exact locators, confidence and ceilings.

Challenge

Contrary evidence and negative findings were checked before strengthening.

Maintenance

Reopen condition, next-check basis and stewardship desk are present.

Release

Routes, metadata, sitemap, indexing policy and static-build constraints pass.