Regional CohortPS-0032

AWS Pennsylvania initial site cohort

Company announcement names first sites; higher state not established in inspected source

C2Two named initial sites within state portfolio

Executive evidence ceiling

What a decision maker may safely take from this record

Permitted reading

A location has been publicly identified for the bounded scope. Company announcement names first sites; higher state not established in inspected source

Not established

A land option or control, zoning application/approval, service request, agreement, construction, energized power, operation, or economic capacity.

Owner attention

Individual site control, approvals, service, construction and allocation

Geography
Salem Township and Falls Township, Pennsylvania
Object subtype
Two Site State Portfolio Cohort
AI connection
Directly tied to cloud and AI infrastructure
Recorded figure
Part of $20B planned Pennsylvania investment; no site allocation or MW
Unit basis
Portfolio capex, not capacity
Countable operating capacity
NO

Conversion-chain position

C0–C21, without implied progression

Handling modeEXACT PROJECT STATE

Explicitly represented in this record Not established by this record
  1. C0–C6

    Entry and permission

    1. C0 Concept or rumor
    2. C1 Public announcement
    3. C2 Site identified
    4. C3 Land option or negotiation
    5. C4 Land controlled
    6. C5 Zoning or land-use application
    7. C6 Zoning or land-use approval
  2. C7–C10

    Service-model fork

    1. C7 Utility service or interconnection request
    2. C8 Study or review accepted
    3. C9 Tariff or service pathway identified
    4. C10 Agreement executed or obligation recorded
  3. C11–C17

    Build and operation

    1. C11 Network, generation, or facility upgrades funded
    2. C12 Construction started
    3. C13 Major electrical and cooling equipment delivered
    4. C14 Grid or onsite supply energized
    5. C15 Facility commissioned
    6. C16 IT capacity installed
    7. C17 Compute cluster operating
  4. C18–C20

    Dark Zone

    1. C18 Contracted customer use observed
    2. C19 Utilization or revenue effect observed
    3. C20 Sustained economic compute capacity
  5. C21

    Changed status

    1. C21 Delayed, cancelled, downsized, superseded, or repurposed

Recorded position: C2

Company announcement names first sites; higher state not established in inspected source

State boundary

Scope-specific assertions

C2Site identifiedTwo named initial sites within state portfolio

What this establishes

A location has been publicly identified for the bounded scope.

What this does not prove

A land option or control, zoning application/approval, service request, agreement, construction, energized power, operation, or economic capacity.

Four-register control

Figures stay in the register that produced them

No cross-register conversion is performed without an explicit source-stated bridge.

  1. R01Load

    Not normalized

    The tracker row carries a money-register figure (Part of $20B planned Pennsylvania investment; no site allocation or MW); it is not treated as load.

    No load quantity is imputed from money, supply, accelerator count or project state.

  2. R02Supply

    No bridge inferred

    No supply-register quantity is normalized for this record.

    Project state is not treated as proof of deliverable, firm or operating supply.

  3. R03Money

    Recorded, basis-bound

    Part of $20B planned Pennsylvania investment; no site allocation or MW

    Portfolio capex, not capacity

  4. R04AI-share

    Source-bounded description

    Directly tied to cloud and AI infrastructure

    Total data-center, campus or portfolio measures remain broader than AI unless the source provides an explicit AI-share boundary.

Aggregation policy: Not summable in this edition. No total, rank or realization percentage is generated.

AI-share boundary

Broader infrastructure does not become AI-only by implication

Directly tied to cloud and AI infrastructure

01

Broader measured scope

Campus, data-center, portfolio, utility, accelerator or financial quantity.

Explicit source bridge

Named AI workload or customer scope · denominator · period · allocation method.

02

AI-attributable subset

Reportable only to the extent directly defined by the source.

Source-bounded AI description

Without the bridge, retain the broader label and stop the attribution.

Control rule: GPU count, company narrative, total campus MW or portfolio capex does not supply an AI-share denominator on its own.

Atomic evidence stack

Claims retain their own ceiling, locator and sources

0 linked claims at the current cutoff.

No atomic claim is linked to this tracker row. Do not strengthen the row from surrounding context.

Record stewardship

What is known, missing and capable of changing the record

Contrary evidenceNo linked test at cutoff

Absence of a linked item is not proof that contrary evidence does not exist.

Negative findingsNo linked negative finding

Continue to treat unknown information as unknown, not zero.

Reopen triggers1 active rule

A qualifying evidence delta requires review and rebuild.

What could change this record

  • OIR-0019 · Any bounded project receives a material cancellation, downsizing, land/permit decision, construction milestone, service agreement, energization, commissioning, phase redefinition, or portfolio-capacity reconciliation.

    Required update: Create dated state observation; preserve prior state; record supersession/overlap; update affected capacity fields without borrowing later-state language.

Source register

Trace the public record

1 linked source; rights and locators remain attached.

Source records

  1. SRC-0079 — Amazon plans $20 billion investment in Pennsylvania cloud and AI infrastructure

    Amazon · 2025-06-09 · Tier A-minus

    Locator: Planned investment; first named sites in Salem Township and Falls Township

    PUBLIC COMPANY/SEC RECORD — CITE/SUMMARIZE