Regulatory Or Tariff FrameworkPS-0009
SPP HILL participant cohort
HILL/HILLGA processes effective; FERC accepted CHILLS effective July 1, 2026 subject to condition; no participant agreement or outcome inferred.
Framework status with scoped C9/C10 only; participant states unknownProcess categoryExecutive evidence ceiling
What a decision maker may safely take from this record
Permitted reading
An applicable tariff, service category, or regulatory pathway exists for the stated scope. HILL/HILLGA processes effective; FERC accepted CHILLS effective July 1, 2026 subject to condition; no participant agreement or outcome inferred.
Not established
Customer participation, executed agreement, funded upgrades, deliverability, construction, energized power, operation, or economic capacity.
Owner attention
Participant identities and results
- Geography
- SPP footprint
- Object subtype
- Conditional Service Framework
- AI connection
- Potentially includes data centers; project mix not public in Pass 01
- Recorded figure
- Tariff thresholds/process values; not operating load
- Unit basis
- Process eligibility, not operating load
- Countable operating capacity
- NO
Conversion-chain position
C0–C21, without implied progression
Handling modeFRAMEWORK SCOPED
-
C0–C6
Entry and permission
- C0 Concept or rumor
- C1 Public announcement
- C2 Site identified
- C3 Land option or negotiation
- C4 Land controlled
- C5 Zoning or land-use application
- C6 Zoning or land-use approval
-
C7–C10
Service-model fork
- C7 Utility service or interconnection request
- C8 Study or review accepted
- C9 Tariff or service pathway identified
- C10 Agreement executed or obligation recorded
-
C11–C17
Build and operation
- C11 Network, generation, or facility upgrades funded
- C12 Construction started
- C13 Major electrical and cooling equipment delivered
- C14 Grid or onsite supply energized
- C15 Facility commissioned
- C16 IT capacity installed
- C17 Compute cluster operating
-
C18–C20
Dark Zone
- C18 Contracted customer use observed
- C19 Utilization or revenue effect observed
- C20 Sustained economic compute capacity
-
C21
Changed status
- C21 Delayed, cancelled, downsized, superseded, or repurposed
Recorded position: Framework status with scoped C9/C10 only; participant states unknown
HILL/HILLGA processes effective; FERC accepted CHILLS effective July 1, 2026 subject to condition; no participant agreement or outcome inferred.
Signature model · C7–C10
One state vocabulary, five non-transferable service pathways
Each row requires its own authority, instrument, scope and evidence. A state or capacity measure cannot be borrowed from another row.
-
R Retail large-load service
Utility · state commission
- C7
Service request
- C8
Accepted utility review
- C9
Tariff or service class
- C10
Executed service obligation
-
T Transmission service
Transmission provider · RTO/ISO · FERC
- C7
Transmission request
- C8
Accepted system study
- C9
Transmission tariff path
- C10
Executed service obligation
-
G Generator interconnection
Interconnecting utility · RTO/ISO
- C7
Interconnection request
- C8
Accepted study stage
- C9
Interconnection tariff path
- C10
Executed agreement or obligation
-
C Co-location
Facility owner · utility · relevant regulator
- C7
Arrangement request
- C8
Technical or regulatory review
- C9
Applicable co-location path
- C10
Executed facility-specific obligation
-
B Behind the meter
Site owner · utility · local/state authority
- C7
On-site arrangement request
- C8
Engineering or compliance review
- C9
Ownership and service path
- C10
Executed on-site obligations
State boundary
Scope-specific assertions
What this establishes
An applicable tariff, service category, or regulatory pathway exists for the stated scope.
What this does not prove
Customer participation, executed agreement, funded upgrades, deliverability, construction, energized power, operation, or economic capacity.
Four-register control
Figures stay in the register that produced them
No cross-register conversion is performed without an explicit source-stated bridge.
-
R01Load Recorded, basis-bound
Tariff thresholds/process values; not operating load
Process eligibility, not operating load
-
R02Supply No bridge inferred
No supply-register quantity is normalized for this record.
Project state is not treated as proof of deliverable, firm or operating supply.
-
R03Money No bridge inferred
No separate money-register metric is normalized for this record.
Capex, contract value, backlog, RPO, revenue and utilization are not converted into capacity or operating state.
-
R04AI-share Source-bounded description
Potentially includes data centers; project mix not public in Pass 01
Total data-center, campus or portfolio measures remain broader than AI unless the source provides an explicit AI-share boundary.
Aggregation policy: Not summable in this edition. No total, rank or realization percentage is generated.
AI-share boundary
Broader infrastructure does not become AI-only by implication
Potentially includes data centers; project mix not public in Pass 01
Atomic evidence stack
Claims retain their own ceiling, locator and sources
0 linked claims at the current cutoff.
No atomic claim is linked to this tracker row. Do not strengthen the row from surrounding context.
Record stewardship
What is known, missing and capable of changing the record
Absence of a linked item is not proof that contrary evidence does not exist.
Continue to treat unknown information as unknown, not zero.
A qualifying evidence delta requires review and rebuild.
What could change this record
OIR-0053· SPP files CHILLS compliance, FERC acts on compliance, or a public participant agreement/service outcome appears.Required update: Separate tariff compliance, agreement execution, service commencement, curtailment and operating outcomes.
Source register
Trace the public record
4 linked sources; rights and locators remain attached.
Source records
-
SRC-0033— High Impact Large Load (HILL) IntegrationSouthwest Power Pool · 2026-01-15 · Tier A-minus
Locator: Program landing page and document links
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE
-
SRC-0034— Order Accepting SPP HILL and Generation Assessment RevisionsFederal Energy Regulatory Commission · 2026-01-14 · Tier A
Locator: 194 FERC ¶ 61,031; ER26-247-000; ordering paragraphs
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE
-
SRC-0035— SPP Compliance Filing — HILL/HILLGASouthwest Power Pool · 2026-02-06 · Tier A
Locator: ER26-247-001; filed tariff revisions
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE
-
Federal Energy Regulatory Commission · 2026-06-05 · Tier A
Locator: 195 FERC ¶ 61,196; paras. 6–7, 104–105; ordering paras. A–B; effective July 1, 2026
PUBLIC OFFICIAL RECORD — CITE/SUMMARIZE