ProjectPS-0025
xAI Colossus
Company current page states 200,000 H100 GPUs in one interconnected cluster
C17Operating compute clusterExecutive evidence ceiling
What a decision maker may safely take from this record
Permitted reading
The specified compute cluster is operating under the evidenced source and scope. Company current page states 200,000 H100 GPUs in one interconnected cluster
Not established
Measured operating MW, customer use, utilization, revenue, profitability, sustained economic capacity, or operation of every phase.
Owner attention
Dated configuration, measured load, supporting infrastructure, utilization and economic output
- Geography
- Memphis, Tennessee
- Object subtype
- Operating Compute Cluster
- AI connection
- Direct AI training/inference infrastructure
- Recorded figure
- 200,000 H100 GPUs; operating MW unknown
- Unit basis
- Accelerator count only; no MW conversion
- Countable operating capacity
- UNKNOWN — PUBLIC EVIDENCE NOT LOCATED
Conversion-chain position
C0–C21, without implied progression
Handling modeEXACT PROJECT STATE
-
C0–C6
Entry and permission
- C0 Concept or rumor
- C1 Public announcement
- C2 Site identified
- C3 Land option or negotiation
- C4 Land controlled
- C5 Zoning or land-use application
- C6 Zoning or land-use approval
-
C7–C10
Service-model fork
- C7 Utility service or interconnection request
- C8 Study or review accepted
- C9 Tariff or service pathway identified
- C10 Agreement executed or obligation recorded
-
C11–C17
Build and operation
- C11 Network, generation, or facility upgrades funded
- C12 Construction started
- C13 Major electrical and cooling equipment delivered
- C14 Grid or onsite supply energized
- C15 Facility commissioned
- C16 IT capacity installed
- C17 Compute cluster operating
-
C18–C20
Dark Zone
- C18 Contracted customer use observed
- C19 Utilization or revenue effect observed
- C20 Sustained economic compute capacity
-
C21
Changed status
- C21 Delayed, cancelled, downsized, superseded, or repurposed
Recorded position: C17
Company current page states 200,000 H100 GPUs in one interconnected cluster
Signature model · C17–C20
The evidence boundary becomes less observable after operation
The gradient represents public-record visibility, not the existence or absence of private activity.
- C17Threshold observation
Operating infrastructure
A bounded operating statement or equivalent observation.
Boundary: Does not establish customer use, utilization or project economics.
- C18Commercial bridge
Contracted use
A scoped arrangement linking operating capacity to customer use.
Boundary: Contract scope, customer identity or capacity denominator may remain private.
- C19Measured downstream use
Utilization or revenue
A comparable measure with denominator, period and project scope.
Boundary: Portfolio or company-wide metrics may not isolate the named project.
- C20Durable operating-economic bridge
Sustained economic capacity
Evidence connecting sustained operation, use and economic output.
Boundary: Public project-level evidence is often absent or non-comparable.
Unknown is not zero. Missing public C18–C20 evidence is recorded as a scoped gap, not as proof of full utilization, failure or stranded capacity.
State boundary
Scope-specific assertions
What this establishes
The specified compute cluster is operating under the evidenced source and scope.
What this does not prove
Measured operating MW, customer use, utilization, revenue, profitability, sustained economic capacity, or operation of every phase.
Four-register control
Figures stay in the register that produced them
No cross-register conversion is performed without an explicit source-stated bridge.
-
R01Load Recorded, basis-bound
200,000 H100 GPUs; operating MW unknown
Accelerator count only; no MW conversion
-
R02Supply No bridge inferred
No supply-register quantity is normalized for this record.
Project state is not treated as proof of deliverable, firm or operating supply.
-
R03Money No bridge inferred
No separate money-register metric is normalized for this record.
Capex, contract value, backlog, RPO, revenue and utilization are not converted into capacity or operating state.
-
R04AI-share Source-bounded description
Direct AI training/inference infrastructure
Total data-center, campus or portfolio measures remain broader than AI unless the source provides an explicit AI-share boundary.
Aggregation policy: Not summable in this edition. No total, rank or realization percentage is generated.
AI-share boundary
Broader infrastructure does not become AI-only by implication
Direct AI training/inference infrastructure
Atomic evidence stack
Claims retain their own ceiling, locator and sources
0 linked claims at the current cutoff.
No atomic claim is linked to this tracker row. Do not strengthen the row from surrounding context.
Record stewardship
What is known, missing and capable of changing the record
Absence of a linked item is not proof that contrary evidence does not exist.
Continue to treat unknown information as unknown, not zero.
A qualifying evidence delta requires review and rebuild.
What could change this record
OIR-0020· Public evidence provides measured operating load, commissioned IT capacity, customer-use, utilization, revenue/economic incidence, or independent verification for a C17 project.Required update: Verify unit, period, site boundary and source function; upgrade only the supported state; preserve contrary evidence and C18–C20 distinctions.
Source register
Trace the public record
1 linked source; rights and locators remain attached.
Source records
-
xAI · UNSTATED — CURRENT PAGE AT RETRIEVAL · Tier A-minus
Locator: Company statement: 200,000 NVIDIA H100 GPUs in a single interconnected cluster
PUBLIC COMPANY/SEC RECORD — CITE/SUMMARIZE