Registry control plane

Coverage that helps editors see what is controlled — and what is not.

Counts below describe record governance, not capacity, market share or project realization.

Records in view
6
Typed objects only
Exact state handling
5
Single bounded project state
Scoped handling
1
Composite, framework or non-project
Latest verification
Archive cutoff, not live monitoring

Record-control coverage

  • Source IDs6/6
  • Reopen triggers6/6
  • Unit-basis fields6/6
  • Public-gap fields6/6
  • Profile routes6/6

Four-register governance

  1. R01
    Load

    Every figure remains attached to its raw wording, unit basis, state basis and geography.

    6 governed
  2. R02
    Supply

    Service, deliverability and generation pathways remain separate from load and compute operation.

    6 governed
  3. R03
    Money

    Capex, backlog, contracted power and revenue are never treated as interchangeable measures.

    6 governed
  4. R04
    AI-share

    Data-center activity is not converted into AI-only activity without a source-stated allocation.

    6 governed

Controlled records

Campuses and phases registry

Open a profile for the complete state basis, source IDs, public-record gap and reopening condition.

State handling

C10 ceiling

Exact project state

Recorded figure

Earlier ISA context up to 150 MW behind each of two units; revised AWS PPA up to 1,920 MW through 2042

Contractual maximum MW under different arrangements/vintages; not energized or average load
Evidence controls and maintenance notes
Record scope
Named campus / generation-customer contractual record
State basis
Revised front-of-the-meter AWS PPA transitioned April 2026; physical delivery and campus operation not established
AI connection
Documented as data-center/AI-related in FERC record context
Confidence
HIGH for current contractual disclosure; NONE for C14–C20
Public-record gap
Detailed delivery profile, campus energization, utilization and economics not public
Source controls
3 source IDs ·SRC-0008SRC-0010SRC-0161
Reopen condition
OIR-0051
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
High-priority evidence watch · 54 days old at edition

PS-0012P1

Stargate I / Crusoe Abilene initial phase

Abilene area, Taylor County, Texas

State handling

C17

Exact project state

Recorded figure

200+ MW design for initial phase; current operating MW unknown

Facility design power, not measured operating/average/IT load
Evidence controls and maintenance notes
Record scope
Initial two-building phase
State basis
Company states two buildings energized, racks installed and early training/inference workloads running
AI connection
Directly documented AI training and inference
Confidence
MEDIUM-HIGH state / LOW quantity
Public-record gap
Measured load, installed IT quantity, utilization, customer use, revenue/economic output
Source controls
2 source IDs ·SRC-0066SRC-0067
Reopen condition
OIR-0020
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
Critical evidence watch · 54 days old at edition

PS-0013P1

Crusoe Abilene full-campus expansion

Abilene area, Taylor County, Texas

State handling

Multiple exact scoped state assertions; no flattened badge

Multiple scoped assertions

Recorded figure

1.2 GW total campus design

Facility/site design power; total includes initial phase
Evidence controls and maintenance notes
Record scope
Total campus including initial phase
State basis
Six additional buildings described as under construction; 1.2 GW total design includes initial phase
AI connection
Directly documented AI infrastructure
Confidence
MEDIUM-HIGH construction / LOW completed quantity
Public-record gap
Phase-level permits, delivery, energization and commissioning quantities
Source controls
2 source IDs ·SRC-0067SRC-0066
Reopen condition
OIR-0019, OIR-0020
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
Critical evidence watch · 54 days old at edition

PS-0019P2

Microsoft Mount Pleasant data center campus

Mount Pleasant, Racine County, Wisconsin

State handling

C12

Exact project state

Recorded figure

No normalized public power quantity in inspected source

No capacity counted
Evidence controls and maintenance notes
Record scope
Multi-phase campus
State basis
Phase 1 near completion; Phase 2 construction; Phase 3 earthwork
AI connection
AI connection documented at company portfolio level; site-specific workload not yet counted
Confidence
MEDIUM-HIGH
Public-record gap
Energization, commissioning, IT installation, site load and workload
Source controls
1 source ID ·SRC-0068
Reopen condition
OIR-0019
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
High-priority evidence watch · 54 days old at edition

PS-0028P1

Google Jackson County existing data center campus

Jackson County, Alabama

State handling

C17

Exact project state

Recorded figure

UNKNOWN — PUBLIC EVIDENCE NOT LOCATED

No public measured operating MW
Evidence controls and maintenance notes
Record scope
Existing campus
State basis
Company states campus has operated since 2019; current locations page lists it as active
AI connection
Google compute infrastructure; AI-specific share not public
Confidence
MEDIUM-HIGH state / LOW quantity
Public-record gap
Operating MW, IT capacity, AI share, utilization and economic output
Source controls
2 source IDs ·SRC-0073SRC-0076
Reopen condition
OIR-0020
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
Critical evidence watch · 54 days old at edition

PS-0029P2

Google Jackson County 2026–2027 expansion

Jackson County, Alabama

State handling

C1

Exact project state

Recorded figure

$1.5B announced investment

Announced capex, not capacity
Evidence controls and maintenance notes
Record scope
Announced expansion of existing campus
State basis
$1.5B expansion announced June 2026; no implementation evidence in source
AI connection
Google AI/cloud infrastructure context
Confidence
HIGH announcement / LOW implementation
Public-record gap
Scope, permits, construction, energization, IT and capacity
Source controls
1 source ID ·SRC-0076
Reopen condition
OIR-0019
Aggregation policy
Not summable with other tracker figures.
Stewardship desk
Project & campus evidence desk
Review posture
High-priority evidence watch · 54 days old at edition